Thanks to the support of Tulsa voters, the 2015 Bond revitalized Edison Preparatory School with major renovations that created brighter, more comfortable, and flexible learning spaces for students! The 2021 Bond for Tulsa Public Schools will continue that building modernization by:
PROPOSITION 1: SAFE LEARNING |
- Security cameras and radios
- Safe entry and door access control
- Accessibility building improvements
- Parking lot, sidewalk, and exterior LED lighting
- Roofing
- Dining/ kitchen improvements
- Furniture
- Air quality/HVAC replacements - federally funded by the CARES Act
PROPOSITION 2: STUDENT AND CLASSROOM TECHNOLOGY |
- Network and systems upgrades
- Student and teacher technology
PROPOSITION 3: TRANSPORTATION |
Funding from Proposition 3 will ensure that all students have access to safe, comfortable, and dependable transportation.
PROPOSITION 4: QUALITY LEARNING MATERIALS AND PROGRAMS |
- Textbooks and learning materials
- Fine arts and auditorium upgrades
- Library digital and print resources
- STEM Lab upgrades
- School projects funds
- Wellness and physical education